.jpeg)
Residential Septic Field
Chambers and piping laid out and installed before final backfill and property restoration.
Some of the most important work disappears when the project is finished. Here is a closer look at septic, drainage, piping and underground infrastructure before it is covered.
← BACK TO HOMEFrom system layout and excavation to tank placement, chambers, connections and backfill, B.K.C. coordinates the work that has to be right before it disappears underground.
.jpeg)
Chambers and piping laid out and installed before final backfill and property restoration.

Crane and site coordination for precise placement of a large precast underground septic structure.

Installed components protected and prepared as the site moves toward backfill and finish grading.
Trenching, drainage preparation, piping and utility tie-ins are routed and installed to serve the property before the site is closed back up.

Multiple lines routed through a prepared trench during active construction.

Piping installed alongside the foundation before backfill, with grades and connections coordinated around the structure.

Extended trench excavation for underground infrastructure along an existing drive and wooded property.

Stone and fabric preparation beside the foundation create the base for below-grade drainage work.
Talk directly with B.K.C. about your site and the work it needs.
603-234-2630One contractor for the groundwork, infrastructure, hardscape and final finish.
CONTACT B.K.C.